HYDROKINETIC PROJECTS
In order to minimize installation and infrastructure costs Emerging Energies Pvt. Ltd. is concentrating on installing its technologically innovative units initially on Canals and the outflow Channels of existing Hydro Electric project. The Bhakra Beas Management Board is responsible for regulation of supply of water from Satluj, Ravi and Beas to the States of Punjab, Haryana and Rajasthan. One of the canals under its jurisdiction is the Bhakra Main Line. Bhakra Main Link (BML) takes off from the tail end of the Nangal Hydel Channel at Ropar and is aligned towards Tohana in the Hissar District. It is a lined channel of 172 km long with a full supply capacity of 354 cumec. The Narwana, Fatehabad and the Bhakra main branches take off from the Bhakra Main Line and through distributaries, irrigate areas of Punjab, Haryana and Rajasthan. In this Canal system alone Emerging Energies has identified 53sites with constrictions in flow ofwater at aqueducts that offer high velocities of water upto 4 m/sec/ As our system operates at less than 3 m/sec at peak capacity, this flow is very substantial and will yield upto 79.5 MW of electricity only at the constrictions in the canal with minimal infrastructure and deployment costs.
|
Every drop counts. Save Water - Save the Planet. |
| Contact Us | Blog | News | Jobs | Copyright@2009 |